Wiring Diagram; Important - baltur TBG 45 Manual De Instrucciones

Ocultar thumbs Ver también para TBG 45:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 47

WIRING DIAGRAM

The three-phase power supply line must have a switch with fuses.
The regulations further require a switch on the burner's power sup-
ply line, outside the boiler room and in an easily accessed position.
For the electrical connections (line and thermostats), follow the
wiring diagram enclosed. To carry out the connection of the burner
to the power supply line proceed as follows:
-
Remove the lid by unscrewing the 4 screws (1) in figure 1. In
this way the burner's electrical panel can be accessed.
-
Slacken screws (2) and, after removing the cable float plate
(3), pass the two 7 and 4 pole plugs through the hole (see figu-
re 2). In the case of a three-phase burner, connect the power
supply cables (4) to the contactor, fix the ground cable (5) and
tighten its cable holder.
-
Reposition the cable float plate as in figure 3. Turn the cam (6)
so that the float exerts sufficient pressure on the two cables,
then tighten the screws that fasten the cable float. Finally, con-
nect the two 7 and 4-pole plugs.
IMPORTANT: the housings for the cables for the 7 and 4-pole
plugs are respectively for cable Ø 9.5-10 mm and
Ø 8.5-9 mm, this to make sure the protection rating
of IP 44 (IEC EN 60529) for the electrical panel.
-
To reclose the electrical panel lid, tighten the 4 screws (1) with
a torque of about 5 Nm to ensure the correct seal.
IMPORTANT: only qualified technicians may open the bur-
ner's electrical panel.
Fig. 1
Fig. 2
Fig. 3
Fig. 4
9 / 18
0006081362_201106
E
N
G
L
I
S
H

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Tbg 60Tbg 45 pTbg 60 p

Tabla de contenido