Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

5 Connecting to power supply
22
5.5

Switch-on phase

After connecting the instrument to power supply or after a voltage
recurrence, the instrument carries out a self-check for approx. 30 s:
Internal check of the electronics
Indication of the instrument type, hardware and software version,
measurement loop name on the display or PC
Indication of the status message "F 105 Determine measured
value" on the display or PC
The output signal jumps to the set fault current
As soon as a plausible measured value is found, the corresponding
current is outputted to the signal cable. The value corresponds to the
actual level as well as the settings already carried out, e.g. factory
setting.

Publicidad

Tabla de contenido
loading

Tabla de contenido