Yamaha 20C Manual De Servicio página 118

Ocultar thumbs Ver también para 20C:
Tabla de contenido

Publicidad

POWR
PREPARATION FOR OVERHAUL/REMOVAL
G30000-0
PREPARATION FOR THE
OVERHAUL
1. Clean all dirt, mud, dust and foreign material
from the engine before the engine is removed
and disassembled.
2. To ensure that you can perform the work clean-
ly and efficiently, check that you have the prop-
er tools and cleaning equipment before com-
mencing engine removal and disassembly.
3. During engine disassembly, as parts are disas-
sembled, clean them and place them in trays in
their order of disassembly. This will speed up
assembly and help ensure that all parts are cor-
rectly reinstalled.
NOTE :
When disassembling the engine, keep mated parts
together, e.g., cylinder and piston and other parts
that have been 'mated' through normal wear. Mated
sets should be re-used on reassembly, or replaced
complete.
G40002-0*
REMOVAL
1) Remove the electrical system parts referring to
page 8-1.
2) Remove the fuel system parts referring to page
4-1.
3) Disconnect the hoses and control cables refer-
ring to the illustrations.
4) Remove the power installation bolts, and then
remove the power head from the upper casing.
5-2
E

Publicidad

Tabla de contenido
loading

Tabla de contenido