ROTATING THE COIL
WARNING! in the technical areas, make
sure there is a suitable amount of space
on the left-hand side of the unit for the
lamp replacement procedure.
If the hydraulic connections require the
rotation of the coil, remove the cover or the
front panel (1) and proceed as follows:
– remove the condensate drip tray (3);
– remove the screws and remove the coil
case (4);
– remove the screws securing the coil (5),
then remove the coil;
– remove the push-outs (6) on the right
side;
4
5
13
10
11
15
14
20
– remove the plate (12) from the left side
(3 screws); the hole will be used when
inserting the germicidal lamp (14);
– remove the lamp holder flange (13) from
the right side and refit it to the left side;
– rotate the coil (5) and secure it using the
screws removed previously;
– refit the cover (4), secure using the
screws, then insert the plastic plugs
supplied (7) in the holes left free by the
hydraulic connections; all the trays can
be used for condensate drainage on
both sides. In case of vertical installa-
tion, for condensate drainage on the
7
7
9
right side, position the drain connec-
tion to the right (8).
– slide out the electrical wirings from the
right side, remove the push-out and
move the cable guide (9) from the right
to the left side;
– transfer the electrical wirings to the left
side through the cable guide (9);
– move the control board (10), the
ground jumper connection (11) and the
electrical devices to the left side (15);
WARNING! Close off the hole (12) on the
right side using the plate removed from
the left side.