12
Pass that assembled in the previous stage (figure 10) through the dedicated loading kit compartment.
Fix the kit (D) to the wall with screws (not provided), using 2 upper holes and 2 lower holes.
Fit the hose (A) to the flange fixed to the structure (B).
ONLY FOR RECOMMENDED INSTALLATION
13
Fasten the hose to the structure using the band provided (as in figure B).
Check fixing (7) as in figure C.
ONLY FOR RECOMMENDED INSTALLATION
ENGLISH
ENGLISH
7
C
14
14
11
12
25