Lamp (Re)Placement; Overhead Rigging - Briteq BT700S Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

ENGLISH

LAMP (RE)PLACEMENT

In case of replacement of the lamp or maintenance, do not open the fixture within 10
minutes until the unit cools down after switching off. Always unplug the unit before
servicing! Always use the same type of spare parts (bulbs, fuses, etc.) When replacing
parts, please only genuine spare parts.
 Switch off the main supply and unplug the unit.
 Wait for about 15 minutes until the unit has been cooled down.
 Open the plastic top cover (5screws) (n° 1 on the photo)
 Remove the screws and open the metal lamp cover (2screws) See the drawing (n° 2) for the exact
location.
 Remove the old lamp (never handle the lamp when it is hot)
Attention! Check the label on the backside of the device or see the technical specifications in this manual
to know which lamp should be used. Never install lamps with a higher wattage!
 Don't touch the bulb with bare hands! This drastically shortens the lifespan of the lamp. If you touched the
lamp, clean it with a cloth and a little denatured alcohol. Wipe the lamp off before installing.
 Put the new lamp back inside the unit. Be sure that the 2 metal spring clips are on the front (lens) side of
the lamp (see drawing) .
 Important: the bulge in the middle of the lamp has a small nipple (n° 3
on the photo). It's very important that this nipple points down
when you install the lamp!!!
 Put the metal cover plate back in place and fix it with the 2 screws.
 Put the plastic top cover back in place and fix the 5 screws.
 Done!
EXCHANGING/ROTATING GOBOS
ATTENTION: Install the gobos
only when the unit is switched
off!
Never unscrew the screws of the rotating
gobo as the ball bearing will be opened.
Repairing this is very difficult!
 Switch off the main supply and unplug the
unit.
 Open the plastic top cover (5screws)
 Locate the gobo wheel and remove the fixation ring of the gobo you want to change with an appropriate
tool.
 Remove the gobo and insert the new gobo.
 Press the fixation-ring together and insert it in the front of the gobo.
 Done!
BRITEQ
3/72
®
OPERATION MANUAL
BT700S
ENGLISH

OVERHEAD RIGGING

 Important: The installation must be
carried out by qualified service personal
only. Improper installation can result in
serious
injuries
and/or
damage
to
property.
Overhead rigging requires
extensive experience! Working
load
limits should be respected, certified
installation materials should be used, the
installed device should be inspected
regularly for safety.
 Make sure the area below the installation
place is free from unwanted persons during
rigging, de-rigging and servicing.
 Locate the fixture in a well ventilated spot,
far away from any flammable materials and/or liquids. The fixture must be fixed at least 50cm from
surrounding walls.
 The device should be installed out of reach of people and outside areas where persons may walk by or be
seated.
 Before rigging make sure that the installation area can hold a minimum point load of 10times the device's
weight.
 Always use a certified safety cable that can hold 12times the weight of the device when installing the unit.
This secondary safety attachment should be installed in a way that no part of the installation can drop
more than 20cm if the main attachment fails.
 The device should be well fixed; a free-swinging mounting is dangerous and may not be considered!
 Don't cover any ventilation openings as this may result in overheating.
 The operator has to make sure that the safety-relating and machine-technical installations are approved by
an expert before using them for the first time. The installations should be inspected every year by a skilled
person to be sure that safety is still optimal.
HOW TO SET UP THE UNIT
CONTROL PANEL:
BRITEQ
4/72
®
OPERATION MANUAL
BT700S

Publicidad

Tabla de contenido
loading

Tabla de contenido