Operation
Before use...
1.
Close water-drainage stop cock.
2.
Open water tap.
3.
Switch processor on.
4.
Check liquid level in replenishment and drainage collecting containers.
5.
Wait until the developer temperature is reached. The LED stops flashing when
the heat-up phase is completed.
6.
Run cleaning films through processor.
Working procedure
7.
Processing films:
Open light protection cover. Important: Put film first on left side of infeed tray
and then feed in. During processing films please watch the "Feeding film"
LED. If it flashes, wait until it stops before feeding the next film; the LED must
be continuously on and an acoustic signal must indicate that it is okay to feed
a film.
After work...
8.
Switch the unit off.
9.
Close water tap.
10. Open water-drainage stop cock and drain water out of the machine.
Stand-by mode
When no film is being processed, the machine switches to Stand-by. The chemicals
remain at a constant temperature. The film feed, the replenishment pumps and the
water supply are switched on briefly at regular intervals, to prevent crystallisation of
chemimals on the transport rollers and oxidisation of the chemicals. A film can be
inserted at any time.
.
ECOMAX
TM
Do not place any
object on the proc-
essor.
17