FORCE B
System Type - Parameters Menu
There are 23 parameters, indicated by the letter "P", which are not modifiable from Remote Timer Control.
Parameter
Description
P.01
Heating request selection
P.02
Cascade sensor selection
P.03
No function
P.04
3-way valve time
P.05
Activation timer*
P.06
Deactivation timer*
P.07
Activation power*
P.08
Deactivation power*
P.09
Hydraulic separator function
P.10
System filling function
P.11
3-way valve selection
P.12
0-10Vdc Heating OFF voltage (Temperature Control)**
P.13
0-10Vdc Heating ON voltage (Temperature Control)**
P.14
0-10Vdc Max. voltage (Temperature Control)**
P.15
0-10Vdc Min. temperature (Temperature Control)**
P.16
0-10Vdc Max. temperature (Temperature Control)**
P.17
0-10Vdc Heating OFF voltage (Power Control)**
P.18
0-10Vdc Heating ON voltage (Power Control)**
P.19
0-10Vdc Max. power (Power Control)**
P.20
0-10Vdc Min. power (Power Control)**
P.21
0-10Vdc Max. power (Power Control)**
P.22
Enable DHW Slave boiler (Autocascade)
P.23
Continuous comfort Slave boiler (AX5200SQ)
Notes
1. * These parameters are active only when two controllers are connected to a single display ACP01.
2. ** These parameters are active only when the system operates with input 0-10Vdc.
3.2 Commissioning
B
Checks to be done at first lighting, and after all maintenance operations that invol-
ved disconnection from the systems or work on safety devices or parts of the
boiler:
Before lighting the boiler
•
Open any on-off valves between the boiler and the systems.
•
Check the tightness of the gas system, proceeding with caution and using a soap and water solution to detect any
leaks in connections.
•
Check correct prefilling of the expansion tank (ref. sec. 4.4).
•
Fill the water system and make sure all air contained in the boiler and the system has been vented, by opening the
air vent valve on the boiler and any vent valves on the system.
•
Fill the condensate trap and check correct connection of the condensate elimination system.
•
Make sure there are no water leaks in the system, DHW circuits, connections or boiler.
•
Check correct connection of the electrical system and efficiency of the earthing system
•
Make sure the gas pressure value for heating is that required.
•
Make sure there are no flammable liquids or materials in the immediate vicinity of the boiler
EN
Range
0-5
0=Disabled,
1 or 2=Enabled
0-1
0-255 seconds
0-255 minutes
0-255 minutes
0-100%
0-100%
OFF = Disabled, ON =
Enabled
OFF = Disabled, ON =
Enabled
2/3 = 2 or 3 wires
2 = 2 wires
0.1-10 Vdc
0.1-10 Vdc
0.1-10 Vdc
0-100°C
0-100°C
0.1-10 Vdc
0.1-10 Vdc
0.1-10 Vdc
0-100%
0-100%
OFF = Disabled, ON =
Enabled
OFF = Disabled, ON =
Enabled
cod. 3541T170 - Rev. 00 - 09/2019
FORCE B
FORCE B
FORCE B
80
120
150
0
0
0
0
0
0
0
0
0
0
0
0
1
1
1
5
5
5
70
70
70
25
25
25
OFF
OFF
OFF
OFF
OFF
OFF
2/3
2/3
2/3
2.5
2.5
2.5
3.0
3.0
3.0
10
10
10
20
20
20
90
90
90
2.5
2.5
2.5
3.0
3.0
3.0
10
10
10
0
0
0
100
100
100
OFF
OFF
OFF
OFF
OFF
OFF
159