Preparing the MoJack EZ for Use (Steps 1 - 7)
STEP 1
Unfolding MoJack EZ
• Pull locking pin out to unlock.
• Raise the Tower by pulling up on the Grip Handle.
Once the Tower is in the vertical position, lift up on
the Grip Handle and drop the Tower into the Base.
• The tower will be securely locked in place when the
locking pin retracts and the tower is snug in the
channel behind the crossbar.
Drop Tower into Base
Crossbar
When Tower is
above the bar,
unit is NOT
locked and
UNSECURE.
STEP 2
Installing Lift Arm
• Hang the Lift Arm on the Carrier by hooking the slotted area
of the Lift Arm over the top bar of the Carrier.
• Insert Clevis Pin through the hole in Carrier and lock by
fastening the Small Hair Pin to the Clevis Pin.
MoJack EZ Lift
Operating Instructions
Tower Locking Pin
(unlocked position)
10
Tower Locking Pin
(unlocked position)
Crossbar in
channel
When Tower sits
behind the bar,
unit is locked
and
fully secure.
Top Bar
Clevis Pin hole
Small Hair Pin
Tower Locking
Pin
(locked position)
Carrier
Clevis Pin