Test Run; Before Test Run; Test Run Procedures - Mitsubishi Electric PEA-RP200GA Manual De Instalación

Ocultar thumbs Ver también para PEA-RP200GA:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 51

12. Test run

12.1. Before test run

The test run can be carried out either from the outdoor unit or the indoor unit.
For the test run from outdoor unit, please check the outdoor unit installation manual.
1. Checklist
After the installation, piping setup, and wiring of the indoor and outdoor units is
complete, check that refrigerant is not leaking, the power and control wires are
not loose, and the poles are not reversed.
Use a 500 V insulation resistance tester to make sure that the resistance be-
tween the power terminal and the ground is 1.0 MΩ or more. If it is less than
1.0 MΩ, do not operate the unit. * Absolutely do not touch the tester to indoor/
outdoor connection terminals S1, S2, and S3. An accident could occur.
Before turning the power ON, make sure that test run switch (SW4) of outdoor
controller board is OFF.
Check the electrical power phase. If the phase is reversed, the fan may rotate
in the wrong direction or stop, or unusual sounds may be produced. (PEA-
200, 250, 400, 500)
Starting at least 12 hours before the test run, send current through the
crankcase heater. (If the current is running for a shorter period of time,
damage to the compressor could result.)
For specific models requiring changing of settings for higher ceilings or selec-
tion of power supply ON/OFF capability, make proper changes referring to the
description for Selection of Functions through Remote Controller.
After the above checks are complete, carry out the test run as indicated in the
following outline.

12.2. Test run procedures

1 Turn on the main power supply
While the display on the remote controller indicates "
is disabled. Turn off the "
" indicator before using the remote controller.
"CENTRALLY CONTROLLED"
indicator
2 Press the [TEST] button twice successively within three seconds. Test
run starts.
"TEST RUN" and "OPERATION MODE" are displayed alternately.
3 Press [
] button
Cooling/drying mode: Cool air should start to blow.
Heating mode: Warm air should start to blow (after a while).
4 Check the outdoor unit fan for correct running
The outdoor unit features automatic capacity control to provide optimum fan
speeds. The fan keeps running at a low speed to meet the current outside air
condition unless it exceeds its available maximum power. Then, in actuality,
the fan may stop or run in the reverse direction depending on the outside air,
which does not mean malfunction.
Remote Controller Display
Remote controller is displaying "PLEASE WAIT", and
operation is not possible.
After power is turned ON, "PLEASE WAIT" is dis-
played for 3 mins., then error code is displayed.
Power is turned ON, and "EE" or "EF" are displayed
after "PLEASE WAIT" is displayed.
Display messages do not appear even when remote
controller operation switch is turned ON (operation
lamp does not light up).
Operation display appears but soon disappears even
when remote controller operations are executed.
", the remote controller
˚C
˚C
TEMP.
ON/OFF
Symptoms
Outdoor Substrate LED Display
After "startup" display, "00" is dis-
played (correct operation).
After "startup" display, error code is
displayed.
After "startup" display, "F1" (negative
phase) is displayed.
After "startup" display, "00" or "EE" is
displayed ("EE" is displayed when a
test run is made).
After "startup" display, "EA" (error for
number of units) or "Eb" (unit number
error) is displayed.
After "startup" display, "00" is dis-
played (correct operation).
After "startup" display, "00" is dis-
played (correct operation).
After "startup" display, "00" is dis-
played (correct operation).
5 Press the [
ON/OFF] button to reset the test run in progress
The test run will be automatically shut down after two hours in response to the
AUTO STOP setting of two hours on the timer.
During the test run, the room temperature display shows the indoor unit tubing
temperatures.
In the case of the test run, the OFF timer will activate, and the test run will
automatically stop after two hours.
The room temperature display section shows the control temperature for the
indoor units during the test run.
Check that all the indoor units are running properly for simultaneous twin and
triple operation.
Malfunctions may not be displayed even if the wiring is incorrect.
6 Register a telephone number
The telephone number of the repair shop, sales office, etc., to contact if an
error occurs can be registered in the remote controller. The telephone number
will be displayed when an error occurs.
For registration procedures, refer to 11.4 Function selection of remote control-
ler.
Operation mode display
"TEST RUN" and "OPERATION MODE" are
displayed alternately.
Timer stops test run after two hours.
˚C
Piping temperature display
TEMP.
ON/OFF
Stop test run by pressing the [
MENU
ON/OFF
FILTER
During test run, the RUN lamp remains on.
BACK
MONITOR/SET
DAY
CHECK
TEST
PAR-21MAA
CLOCK
OPERATION
[TEST] button
CLEAR
[
(*1)
After turning ON the power, the system will go into startup mode, and the remote
controller operation lamp (green) and the display section's "PLEASE WAIT" will
flash. Also, in the case of the indoor substrate LEDs, LED 1 and LED 2 light up
(when address is 0) or become dim (when address is not 0), and LED 3 flashes. In
the case of the outdoor substrate LED display,
alternatively at 1-second intervals.
If one of the above operations does not function correctly, the following causes
should be considered, and if applicable, dealt with. (The following symptoms
have been determined under test run mode. Note that "startup" in the chart
means the *1 display above.)
• After power is turned ON, system startup lasts for about 2 mins., and
"PLEASE WAIT" is displayed (correct operation).
• Outdoor unit's safeguard installation connector is open.
• Negative phase and open phase of outdoor unit's power terminal board
(Single phase: L, N,
/triple phase: L1, L2, L3, N,
• Incorrect connection of outdoor terminal board (Single phase: L, N,
triple phase: L1, L2, L3, N,
• Outdoor unit and indoor unit construction differ.
• Wiring for the indoor and outdoor unit is not connected correctly. (Polarity
is wrong for S1, S2, S3)
• Remote controller transmission wire short
• There is no outdoor unit for address 0 (address is something other than
0).
• Remote controller transmission wire burnout
• After cancellation of function selection, operation is not possible for about
30 secs. (correct operation).
ON/OFF] button.
] button
and
are displayed
Cause
)
grounding and S1, S2, S3)
17
/

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pea-rp250gaPea-rp400gaPea-rp500ga

Tabla de contenido