Changing Side; Installation - Erreka NTS324E Manual Del Instalador

Barrera electromecánica
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

INSTALLATION

6

CHANGING SIDE

We recommend carrying out this operation
with the arm dismounted (see "Dismounting
the arm" on page 56). If the arm is mounted,
proceed with great care and get somebody to
support it, preventing it from turning
violently.
1 Disconnect the power supply.
2 Unlock the operator and place the barrier in
vertical position (tension-free spring).
3 Dismount the nut (1) and remove the lower
anchoring (2).
7
INSTALLATION
Prepare the base
1 Prepare a cement base, inserting ducts for the
electrical cables.
2 Insert the base plate in the wet cement,
ensuring it is horizontal and level.
54
Installation Manual
4 Remove the spring (3).
5 Change the control board side (this is secured with
4 sheet metal screws).
6 Loosen the rear nut (4) and use a 10mm Allen key
to remove the upper anchoring (5).
7 Mount on the other side, in reverse order to
disassembly.
To carry out the balancing, see "Balance the
barrier" on page 56.
To adjust the stoppers, see "Adjusting the opening
and closing stoppers" on page 56.
Assemble the equipment on the base
1 Once the cement base has set, place the unit
(1) on the base (2) and secure using the nuts
(3).

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Nts324emNts424eNts424emNts624eNts624em

Tabla de contenido