CHECKING THE IMPACT THRUST

The control panel must be programmed to
respect the values indicated in Standard EN
12453:2000. All measurements must be made in
line with the method described in Standard EN
12445:2000.
• The Standard indicates that dynamic force
must be less than 400N.
5

FINAL CHECKS

Following installation and programming, start up the
operator and check the devices installed.
1 Check the correct working of the operation devices
(pushbutton and wall key, radio control).
2 Check the correct operation of the safety devices
(photocells or mechanical strips).
3 Place an obstacle and make the barrier collide with
it in order to check operation in the event of
collision.
If the system does not work correctly, find out
why and put it right (see section "Failure
diagnosis" on page 64).
STARTING UP AND PROGRAMMING
Measure the impact thrust and compare it to the
values indicated in Standard EN12453:2000. If the
values measured are higher than those in the Standard,
reduce the maximum thrust, the speed of the barrier or
the slowdown speed, or increase the slowdown
distance.
Barrier speed: A20X
Slowdown speed: A30X
Slowdown distance: A40X
Maximum thrust: A6XX

User instruction

1 Instruct the user with regards to the use and
maintenance of the installation and provide him/her
with the instructions on use.
2 Signpost the barrier, showing that it opens
automatically and indicating how to operate it
manually.
Where
appropriate,
operation is using the radio transmitter.
indicate
that
63
NET barriers

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Nts324emNts424eNts424emNts624eNts624em

Tabla de contenido