Dometic GROUP WAECO SinePower Serie Instrucciones De Montaje página 42

Convertidor de ondas seno
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 75
Connecting the inverter
9.6
Connecting parallel operation
NOTICE!
A
 Use a cable with a cross section of 0.25 – 0.75 mm² for for con-
necting to the terminals for parallel operation.
 Parallel operation can only be set up using the same models
(same item number).
 A maximum of three inverters can be operated in parallel.
 The inverters operating in parallel must have the same settings
for mains voltage and mains frequency. (see chapter chapter
"Configuring the inverter" on page 45.
➤ Set the main switch (fig. 5 3, page 4) to "OFF".
➤ Connect the inverter according to the sample circuit diagram (fig. a,
page 6).
In particular, make sure that the bridges for parallel operation are set
correctly:
 Bridge removed (fig. a 1, page 6) for inverter A and set for inverter B and
C.
NOTE
I
The first inverter which is switched on after installing parallel
operation is the master.
42
SinePower
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido