Installing and connecting the control box
6
Installing and connecting the control box
6.1
Tools required
For installation and assembly, you will need the following tools:
Measuring ruler (fig. 4 4, page 4)
Centre punch (fig. 4 5, page 4)
Hammer (fig. 4 6, page 4)
Drill bit set (fig. 4 7, page 4)
Electric drill (fig. 4 8, page 4)
Screwdriver (fig. 4 9, page 4)
To establish and test the electrical connection, the following tools are required:
Diode test lamp (fig. 4 1, page 4) or voltmeter (fig. 4 2, page 4)
Insulating tape
Heat shrinking sleeve
Hot air blower (fig. 4 10, page 4)
Crimping tool (fig. 4 11, page 4)
Soldering iron (optional) (fig. 4 12, page 4)
Solder (optional) (fig. 4 13, page 4)
Cable bushing sleeves (optional)
To fasten the cables you may require additional cable binders.
6.2
Mounting the control box
The control is supplied ready for installation.
➤ Install the control box in a location protected from water near the monitor, preferably
under the dashboard.
Make sure you consider the length of the cable.
➤ Attach the control box using the supplied screws.
22
PerfectView SWITCH200VTO
EN