Pentair Intellibrite 5G Guia De Instalacion página 16

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 91
Circuit board
connector plugs
Thermal
strip (2x)
11. Place the two new thermal strips (provided) over the circuit board studs in
the base of the light housing.
12. Place the light circuit board over the base studs and seat the circuit board
on top of the thermal strips. Be sure the two connecting wires are not caught
between the housing and the edge of the circuit board.
13. Using a ¼" nut driver, tighten each of the four (4) retaining nuts to a torque value
of 6.0 (minimum) to 8.0 (maximum) in-lbs to secure the circuit board. DO NOT
OVERTIGHTEN THE CIRCUIT BOARD NUTS.
INSTALLING THE INTELLIBRITE POOL LIGHT ASSEMBLY
WITH NEW GASKET
nuts ensure proper electrical ground. Failure to install all of the retaining
nuts could create an electrical hazard which could result in death or serious
injury to pool users, installers or others due to electrical shock.
14. Connect the two connector plugs to the circuit board terminals.
Be sure to install ALL of the four (4) retaining nuts. These
Retaining nut (4x)
circuit board
Light housing
Circuit board
stud (4x)

Publicidad

Tabla de contenido
loading

Tabla de contenido