KOBE RA-094 Serie Manual De Uso Y Instalación página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Preparation before Installation
NOTE: TO AVOID DAMAGE TO YOUR HOOD,
PREVENT DEBRIS FROM ENTERING THE
VENT OPENING.
-
Decide the location of the venting pipe from
the hood to the outside. (Figure 1)
-
A straight, short venting run will allow the
hood to perform more efficiently.
-
Try to avoid as many transitions, elbows,
and long run as possible. This may reduce
the performance of the hood.
-
Temporarily wire the hood to test for proper
operation before installing. Refer to step 8
& 9 and figure 8 on page 6.
-
Important: Peel any protective film off the
hood.
-
Use duct tape to seal the joints between
pipe sections.
-
If necessary, prepare back wall frame with
cross framing lumber for secure installation.
Refer to Table 1 and measurements on
Page 11 to decide the level of the lumber.
(Figure 2)
-
Loosen hood-mounting brackets at the back
of the hood, adjust brackets and tighten
screws as shown in Figure 3.
-
If necessary, remove the rubber stand on
the back of the hood and discard. (Figure
4)
Hood Installation
CAUTION: If it is necessary to move the
cooking range to install the hood, be sure to
turn off the power on an electric range at the
main electrical box.
BEFORE MOVING A GAS RANGE.
1. Using
references
measurements on Page 11, mark the
leveling locations point for hood-mounting
bracket on the wall.
2. Secure two mounting screws (not provided)
to the wall, leaving an 1/8" space from the
wall. (Figure 5)
3. Align the hood-mounting bracket to the
mounting screws on the wall and hang hood
into place.
SHUT OFF THE GAS
in
Table
1
Figure 1
Figure 2
Figure 3
Figure 4
and
5

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Ra9430sqbRa9436sqb

Tabla de contenido