Operation; Battery Installation & Usage - Denver ORUS Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3. OPERATION

E3500 is a revolutionary transport means, applying aluminum frame, Li-ion battery, a super high efficiency
electric motor and controller with electric pedal assistance system, to support normal pedaling. The above
mentioned equipment will ensure safe riding with excellent function and performance. It is important for you
to note the following guidelines to ensure getting the best possible experience from your electric bicycle.
Checklist before Riding
3.1.1 Please ensure tyres are fully inflated as indicated on the tyre wall, before riding.
Remember, performance of the bike is directly related to the weight of the rider and baggage/load, together
with the stored energy in the battery;
3.1.2 Charge overnight, prior to riding the next day;
3.1.3 Apply chain oil periodically and clean if dirty or gummed up,- using degreaser, then wipe clean and oil
bicycle chain again.
4. BATTERY INSTALLATION & USAGE.
The electric bikes have the battery positioned onto the frame down tube (the battery pack is directly connected
to the controller box which is under battery bottom.
1. Put the controller to the bottom of down tube, and assure the cable of the controller and the other cables
like motor, display...connection well, then push it inside, as following: (Fig 2.0 ~ 2.2)
(Fig.2.0)
2. Put the plastic bracket to cover the controller, and then use the screws to lock it tightly. (Fig 2.3 ~2.5)
(Fig. 2.3)
(Fig.2.1)
(Fig. 2.4)
(Fig.2.2)
(Fig. 2.5)
6/17

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

E3500

Tabla de contenido