Installation And Putting Into Operation; Scope Of Delivery; Connecting The Printer To The Power Supply - Mettler Toledo P-56RUE Manual De Usuario

Ocultar thumbs Ver también para P-56RUE:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 32

2 Installation and Putting into Operation

Finding more information

2.1 Scope of delivery

The following accessories are part of the equipment:
P-56RUE or P-58RUE thermal printer
Set of paper rolls
Universal AC adapter
Country-specific power cable
USB cable
RS232 cable
User Manual
Declaration of conformity
CD-ROM (containing documents in different languages, software and drivers)

2.2 Connecting the printer to the power supply

1 Connect the AC adapter to the connection socket on
the back of the printer.
2 Lock the connector with the screw nut.
3 Connect the 3-pin grounded power cable to the socket
for the AC adapter.
4 Connect the power cable to the mains.
5 Switch the printer on.
14
Installation and Putting into Operation
Additional information about this printer can be found in the Operating Instructions on the CD-
ROM or online.
WARNING
Risk of electric shock
1 Do not open the AC adapter housing. Make sure that the AC adapter does not come in
contact with liquids.
2 Use only the 3-pin power cable with equipment grounding conductor which was supplied
with your instrument and only a 3-pin grounded outlet must be used.
NOTICE
Use only the original AC adapter delivered with your printer.
− Do not try to use this AC adapter for other METTLER TOLEDO instruments, otherwise they
could be damaged.
Printer

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

P-58rue

Tabla de contenido