Chassis Installation
1. Lift.unit.level.and.slide.unit.into.wall.sleeve.until.from.seal.rests.
firmly.against.front.of.wall.sleeve.
Figure 23
Securing Unit
2. Locate. the. four. supplied. chassis. mounting. screws.. Insert. the.
screws.through.the.chassis.mounting.flange.holes.that.are.aligned.
with.the.speed.nuts.in.the.wall.sleeve..Tighten.all.four.screws.(two.
per.side)..
Figure 24
Replacing Front Panel
2
18
POWER
SUPPLY
CORD
FRP023
1
FRP024
3. Place. tabs. over. top. rail. (1).. . Push. inward. at. bottom. until. panel.
snaps.into.place.(2).
4. Reinstall.front.panel..See.Figure.24..
CAUTION
Excessive Weight Hazard
Use two or more people when installing
your air conditioner.
Failure to do so can result in back
or other injury.
NOTICE
Copper refrigerant tubes are NOT handles.
Do NOT use tubing to lift or move chassis.
To.remove.the.front.cover,.pull.the.bottom.end.forward.and.lift.it.up.to.clear.
the.L.bracket.across.the.top.of.the.chassis.
5. Plug. the. cord. (if. applicable). into. the. appropriate. receptacle.. .
Restore.power.to.the.unit.