GB
1.
Instructions prior to installation
2. Instructions prior to commissioning
3. Commissioning of the boiler
4. Room temperature adjustment
5. DHW temperature adjustment
6. Filling the boiler
7. Turning off the boiler
8. Prolonged standstill of the system.
Frost protection (central heating sys8tem)
9. Gas change
10. Safety Device Indicators-Activation
11. Servicing instructions
6
pag.7
pag. 7
pag. 7
pag. 8
pag. 8
pag. 8
pag. 8
pag.8
pag. 8
pag. 9
pag. 9