Ergomotion SERTA MOTION PERFECT III Manual Del Propietário página 11

Tabla de contenido

Publicidad

installation guide
STEP 5
Uncoil input cord (connected to control box's
power port) and plug into Power Supply .
STEP 6
Uncoil the Power Cord and connect to the
Power Supply . Place Power Supply on the
ground and extend from the base . Ensure that
the Power Supply and all attached cords are
directed toward the desired surge protector .
STEP 7
Carefully flip the base over on to its legs. Important: Two people are
required to move the bed base. Do not drag across the floor. Do not
rest frame on its side, excessive pressure may damage the legs .
STEP 8
WARNING
Always unplug the base from the electrical outlet before servicing any
part of the base. To reduce risk of electric shock, unplug the base before
cleaning. To safely disconnect, ensure the base is in a flat position with all
motors off, and unplug from power source.
For customer support, visit www.ergomotion.com or call: 1-888-550-3746
Plug the base into a power source . A surge protector is strongly
recommended.
STEP 9
Ensure batteries are correctly installed in the back of the remote .
Quickly test functions to verify proper setup before placing mattress on
base. Press FLAT to return the base to a flat position.
STEP 10
Place the mattress on the base .
Select Serta
mattresses are compatible
®
with the mattress retainer attachment panel
installed on the MotionPerfect
III .
®
*If the mattress is not compatible with
the attachment panel.
Slide the left side of the mattress
retainer bar into the bracket . Pull the
retainer bar to the opposite bracket
and secure the right side .
Basic setup is now complete! See page 10-11 for remote control
operating instructions .
9

Publicidad

Tabla de contenido
loading

Tabla de contenido