Unpacking And Inspecting Of The Hinged Cantilever For Extraction Arm 6.0 - 10 M; Assembly Requirements; Recommended Mounting Material; Mounting Material For Mounting On Walls - Kemper 1502199 Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 68
1.2
Unpacking and Inspecting of the Hinged Cantilever for the
Extraction Arm 6.0 - 10 m
1.3

Assembly Requirements

1.4

Recommended Mounting Material

6
M12
130
100
7
M12
130
100
8
M12
130
100
9
M12
130
100
10
M12
130
100
Art. Nr.: 1502199
General Assembly
● Remove the packaging carefully.
● Check if delivery is complete. Use the delivery sheet.
● If any parts are missing or have been incorrectly delivered,
please immediately contact Kemper GmbH or the supplier.
WARNING
Risk of injury due to falling components!
Components that are not adequately attached could detach and
cause serious
injuries!
● For the mounting on walls, use only suitable
mounting material
● Mount the hinged cantilever for the extraction arm
6.0 - 10 m on suitable walls.
● Observe the tightening torques of the screws
● Only use supplied mounting material

Mounting Material for Mounting on Walls

Fischer dowel Highbond anchor
Fischer dowel Highbond anchor
Fischer dowel Highbond anchor
Fischer dowel Highbond anchor
Fischer dowel Highbond anchor
FHB dyn
40
12x100/25
FHB dyn
40
12x100/25
FHB dyn
40
12x100/25
FHB dyn
40
12x100/25
FHB dyn
40
12x100/25
Reinforced
450
concrete C25/30
Reinforced
450
concrete C25/30
Reinforced
450
concrete C25/30
Reinforced
470
concrete C25/30
Reinforced
470
concrete C25/30
200
200
200
200
200
1-2

Publicidad

Tabla de contenido
loading

Tabla de contenido