CULUS Elica Guía De Instalación, Uso Y Mantenimiento página 15

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7. Fit the control shaft in the correct position
by pushing it upwards.
Connect the electricity.
8. Join the two upper sections of the duct
covering the perforated frame.
Fix each individual section in place using
2 screws (1 per side) near the ceiling.
9. Fix the upper duct to the perforated frame
using 10 screws (5 per side).
10. Apply 2 casings (supplied) to cover the
fixing points on the upper duct sections
(CAUTION:
CASINGS ARE EASY TO RECOGNISE
BECAUSE THEY ARE WIDER, DEEPER
AND ARE FITTED BY PRESSING THEM
INTO PLACE).
THE
UPPER
11. First insert the lower section of the duct,
on which the threaded inserts can be
DUCT
found.
Fix it to the frame, tightening the first and
fourth screws on both sides (counting
from the bottom).
15

Publicidad

Tabla de contenido
loading

Productos relacionados para CULUS Elica

Tabla de contenido