COVERING INSTALLATION BIG/VIP
62
22
n°2 viti
2 screws
DETAIL. X
Part. "X"
COVERING INSTALLATION LUX
DETAIL. Z
Part. "Z"
22
62
bushings
23
24
screw
vite
*
28
*
23
22
22
43
62
22
n°2 viti
2 screws
DETAIL. X
Part. "X"
28
ASSEMBLING THE CERAMIC TOP BIG/VIP
cast iron top and place the ceramic top (28)
and the cast iron top.
NOTE:
crazes (cracks) evenly over the whole surface. Crazing is not
a defect but is a characteristic of enamel applied to majolica
known as "craclè".
manually and may present small defects that will not
affect their quality (small dents or enamel porosity), but instead
2 M6x25 screws
2 M6x12 screws
4 silicone spacers for ceramic top
2 bushings
The stove comes furnished with its lateral metal side
panels already assembled, while its ceramic upper and
lower front panels (22) and top (28) must be assembled
as follows:
against the front panel support (23) positioned above the door.
the 2 supplied M6x25 screws (the door must be opened before
performing this operation).
NOTE:
For correct assembly of the upper front panel (22), place the
bushing supplied between the same and the front panel (23), as
shown in detail "Z" in Illustr. 2.
the cast iron lower front grill (43) in place and remove it.
fasten it in place using the 2 supplied M6x25 screws as indica-
ASSEMBLING THE CERAMIC TOP
cast iron top and place the ceramic top (28)
cone spacer and cast iron top.
- 17
-
-