PF 33 MT - PF 46 MT
Installation and connections
Chapter 3
DANGER
All operations described in this chapter shall be
carried out by skilled technicians.
3.1 -
LIFTING OF THE MACHINE (Fig. 1)
• Remove the cap (1)
• Screw in the eyebolt (2)
• Attach the hook of a crane or hoist to the eyebolt (2).
DANGER
Do not stay within the crane or hoist range or under
the uplifted machine.
3.2 - POSITIONING OF THE MACHINE (Fig. 2)
3.2.a - BENCH MACHINE POSITIONING
DANGER
Make sure that the carrying plane is suitable to
support the charges as mentioned in the chapter
"TECHNICAL SPECIFICATIONS".
The machine shall be positioned according to the instruc-
tions reported in Fig 2, since they indicate the minimum
safety range to be considered in order to allow the user
or the technician to properly carry out any work and/or
maintenance operations.
FIG. 1
FIG. 2
600 mm
400 mm
1000 mm
2
1
400 mm
EN - 9