Installation - Sartorius YDP 20-PH Instrucciones De Manejo

Impresora de datos de medición
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Installation

Equipment Supplied
The equipment supplied includes the following:
– Interface cable for connecting the printer to a pH meter
– Ink ribbon
– 4 rechargeable batteries
– Paper roll
– Power supply unit
Installing the Rechargeable Batteries
§ Remove 4 rechargeable batteries from the packaging.
(The batteries are discharged).
§ Open the paper compartment: Lift the paper compartment
cover.
§ Open the rechargeable battery compartment.
Open the rechargeable battery compartment cover.
§ Place 4 rechargeable batteries in the compartment:
Pay attention to correct polarity.
§ Close the rechargeable battery compartment:
Close the compartment cover.
§ Close the paper compartment: Fold down the paper
compartment cover.
– The paper roll can only be engaged when the printer is
switched on.
5

Publicidad

Tabla de contenido
loading

Tabla de contenido