4. Design and function
Alternatively the coding can take place directly in the female connector (rack side) and the
associated male connector (switching amplifier side) after the following coding plan:
GB
The coding pin is inserted with a tool captive in the appropriate place in the female
connector and at the opposite side in the male connector is a drilling.
In mounted case
■
4.3 Scope of delivery
Cross-check scope of delivery with delivery note.
18
time delay on
time delay off
time delay
Failure
Signal
Fuse
Supply
WIKA operating instructions models LSO.06, LSO.25
75 high