Description of unit
3.5
Technical data
Voltage
Max. current consumption
220~240 VAC
100~120 VAC
Power Cord
Acceptance capacity
Max. operating pressure
Volume flow at 12 MPa (120 bar) with water
Max tip size
Max. temperature of the coating material
Max viscosity
Weight
Special high-pressure hose
DN 6 mm, 15 m, connection thread M 16 x 1.5
Altitude
This equipment will operate correctly up to
2000 m above mean sea level
Dimensions (L X W X H)
Vibration
Spray gun does not exceed 2.5m/s
Max sound pressure level
* Place of measuring: 1 m in distance from the unit and 1.6
m above the floor, 12 MPa (120 bar) operating pressure,
reverberant floor.
3.6
Transportation in vehicle
Secure the unit with a suitable fastening.
220~240 VAC, 50/60 Hz or
100~120 VAC, 50/60 Hz
4.5 A
12 A
See page 70
1035 Watt
221 bar (22.1 MPa, 3200 PSI)
2.0 l/min
0.023 inch – 0.58 mm
43°C
20.000 MPa·s
17.9 kg
437 x 363 x 416 mm
80 dB*
GB
4.
Starting operation
4.1
High-pressure hose, spray gun and separating
oil
1. Screw the pressure gauge (1) to the coating material outlet
(Fig. 2, Item 2).
2. Screw the high-pressure hose (3) to the coating material
outlet on the pressure gauge (Fig. 2, Item 4).
3. Screw the spray gun (5) with the selected tip onto the high-
pressure hose.
4. Tighten the union nuts at the high-pressure hoses firmly so
that coating material does not leak.
1
4
2
5. Remove the oil cup cap with a straight-slot screwdriver.
6. Fill the oil cup with Piston Lube (Fig. 3) until the oil gauge (6) is
showing that it is full.
Piston Lube prevents increased wear and tear to the
packings.
Attention
7. Replace oil cup cap.
8. Press oil button 2-5 times to prime the oiler. Press once for
every eight hours of usage to lubricate the fluid section.
8
5
2
3
Starting operation
Performance Series 560e