Unpacking The Product; Handling The Product; Site Selection - Xylem Goulds e-SV Serie Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Lift and handle the product carefully,
using suitable lifting equipment. Observe all
the accident prevention regulations.
When you receive the pump, check the outside of
the package for evident signs of damage. If the
product bears visible signs of damage, notify our
distributor within 8 days from the delivery date.
2. STORING THE PACKED PRODUCT
Ambient temperature 32º F to 104º F.
Short Term: (Less than 6 months) Goulds Water
Technology normal packaging procedure is designed
to protect the pump during shipping. Upon receipt,
store in a covered and dry location.
Long Term: (More than 6 months) Rotate shaft
several times every 3 months. Refer to driver and
coupling manufacturers for their long term storage
procedures. Store in a covered dry location.

3. UNPACKING THE PRODUCT

Use suitable equipment. Observe all the
accident prevention regulations in force. Lift
and handle the product carefully, using
suitable lifting equipment.
When you receive the pump, check the outside of the
package for evident signs of damage. If the product
bears visible signs of damage, notify our distributor
within 8 days from the delivery date.

4. HANDLING THE PRODUCT

Lift and handle the product carefully, using
suitable lifting equipment. Observe the
accident prevention regulations in force.
The product must be securely harnessed for lifting
and handling. Some electric pumps have eyebolts
that can be used for this purpose.
The installation operations must be carried out by
qualified and experienced personnel. Use suitable
equipment and protections. Observe the accident
prevention regulations in force.
Always refer to the local and/or national regulations,
legislation and codes in force relating to the selec-
tion of the installation site and the water and power
connections.
10

1. SITE SELECTION

Make sure that no obstructions or obstacles hinder
the normal flow of the cooling air delivered by the
motor fan. Make sure there is adequate clearance
around the pump for the maintenance operations.
Whenever possible, raise the pump slightly from the
level of the floor. See the figures below and at the top
of the next column for possible installation configu-
rations. Horizontal operation requires special mount-
ing with a horizontally configured pump.
2. ANCHORING
The pump must be anchored securely with bolts to
a concrete foundation or equivalent metal structure
(shelf or platform). If the pump is large-sized and
needs to be installed near rooms inhabited by people,
suitable vibration-damping supports should be pro-
vided to prevent the transmission of the vibrations
from the pump to the reinforced concrete structure.
The dimensions of the pump base and anchoring
holes are shown.
1SV-5SV 10SV-22SV
L1
3.94 (100) 5.12 (130) 6.69 (170) 7.48 (190) 10.83 (275)
L2
7.09 (180) 8.46 (215) 9.45 (240) 10.43 (265) 14.96 (380)
L3
5.91 (150) 7.28 (185) 8.66 (220) 9.45 (240) 12.99 (330)
L4
8.27 (210) 9.65 (245) 11.42 (290) 12.4 (315) 17.72 (450)
Ø A
0.51 (13)
N
L1
L3
33SV
46SV-92SV
125SV
in (mm)
0.59 (15)
0.75 (19)
0.16(4)
ø A x N

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido