STEP 7
1.
Attach the Punch ball frame
(71) and Punch bag frame(71A)
to Bridge Frame(08) tighten
by X2 Hex Head Bolt(30),X4
Washer(34) and X2 Nylon nu(38).
2.
Attach the Punch strengthen Plate (85) to
Punch frame(71,71A) tighten by X2 Hex Head
Bolt(81),X4 Washer(34) and X2 Nylon nu(38).
3.
Connect Punch bag(67) to Punch bag frame(71A)
with Hook(61).
4.
Connect the Punch ball plate(79) to Punch
ball frame (71) with X1 Hex Bolt(28) ,X1 washer
(34) and X1 Nylon Nut(38). And Attach the Ball
Hook(80) to the Punch Ball Plate (79) using X4
Bolt (82),X4 washer (84) and X4 Nylon Nut(83).
5.
Finally , hang up the Punch Ball(68).
STEP 8
1.
Attach the Cable for Lower Pull Bar (66) to the
opening bracket at the front of the Bridge Tube (8).
Note: The ball stopper of the Cable (66) should be
underneath the Bridge Tube (8). Attach the Cable
(66) onto the Small Pulley (49) and put the Cap
MULTY-STATION GYM GYM-300
for Small Pulley (50) to the two side of
Small Pulley (49). Note: The Cable (66)
has to come out of the Cap (50) from the
opening sides. Tighten to the bracket by
X1 Hex Head Bolt (27) and X1 Nylon Nut
(38).
2.
Draw the Cable (66) towards the back
side of the machine through the upper
opening of Upright Support Tube (2)
and around Pulley (48), then attach the
Pulley (48) onto bracket A as drawing,
tighten by X1 Hex Head Bolt (26) and X1
Nylon Nut (38).
3.
Draw the Cable (66) downwards and
around Pulley (48). Attach the Pulley (48)
with the Bracket for Pulley (20) on two
sides then tighten by X1 Hex Head Bolt
(26) and X1 Nylon Nut (38).
4.
Draw the Cable (66) upwards and around
Pulley (48). Attach the Pulley (48) to
bracket B(20) and tighten by X1 Hex
Head Bolt (26) and X1 Nylon Nut (38).
5.
Draw the Cable (66) downwards between
the two Guiding Tube (5) and fully thread
the bolt on the end of the Cable (66) into
the top opening on the Select Bar (12).
6.
Attach the Lat Bar (13) to the front end of
the Cable (66), connect by X1 Hook (61).
35
EN