Atlantic TRION Manual De Instrucciones página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Using a hacksaw, PVC saw or PVC cutters;
remove a 2 ½" section of the waterfall
supply line. (Fig.3) Dry fit the electrode
housing and waterfall supply line to verify
that they line up properly.
Install the electrode housing in a horizontal
position with the threaded port facing the
front of the skimmer. Fig.4) Connections
can be made using standard PVC glue
and cleaner.
A red dot has been placed on the top
of the electrode fitting to ensure proper
alignment. When fully tightened, the red
dot must be aligned with the waterfall
supply line on either the inlet or outlet
side of the electrode housing. This will
orient the probes side-by-side and allow
water to flow between the electrodes
rather than around them. Wrap the
threads with Teflon tape or apply a thin
layer of plumbing paste prior to installing
electrode. This will ensure a water tight
connection and make it easier to remove
the electrode for inspection or replace-
ment. Install the copper electrode (Fig.5),
tighten the fitting by hand and then finish
with 1-2 additional turns using a wrench,
making sure that the red dot aligns with
the center of the waterfall supply line.
Connect the control panel to the
electrode. Fig.6)
The Triton Ionizer can also be installed
inside of Atlantic pump vaults when used
in pond-free water features. (Fig.7)
4
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7

Publicidad

Tabla de contenido
loading

Tabla de contenido