CAB SKYLINE 1 Manual De Instrucciones página 36

Ocultar thumbs Ver también para SKYLINE 1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Before reassembling of the tap components lubricate by water the tap siege as indicated
in Pict. 45 and lubricate with abundant water the seals as indicated in Pict.47.
Pic. 45
Insert the tap spring and tap pin as indicated in Pic. 45 and 46.
Pic. 47
Pic. 48
REASSEMBLY OF THE TAP
When inserting the main tap pin please be
careful that the little square hole (see Pic.
HOLE
47) is placed right in front of you. Before
inserting the tap pin lubricate with
abundant water.
Keep the tap pin pressed upwards until
you are able to see the square hole where
you will insert the handle (see Pict. 48).
Insert the pin for handle fixing as indicated
in Pict. 49.
36
Pic. 46
Pic. 49

Publicidad

Tabla de contenido
loading

Productos relacionados para CAB SKYLINE 1

Este manual también es adecuado para:

Skyline 2Skyline 3

Tabla de contenido