Operating Instructions - Newteck Secadry XLL Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 4

OPERATING INSTRUCTIONS

Installation
1. On a flat surface, assemble the upper and lower shelfs, connecting the
pieces to one another, following the drawing shown below:
Upper shelf
Connect the horizontal tubes (A) and (B)
directly into the plastic shelf hole (C).
2. Connect the lower vertical tubes (G) into the four corners of the lower shelf
(I), following the drawing. Then, place the outer cover of the dryer using the
four vertical tubes, using the four lower holes.
3. To assemble the structure, connect the lower vertical tubes (G) and the
middle level plastic shelves (F), as shown in the drawing. Repeat the same
process for the upper vertical tubes (D) and connect the upper shelf (C)
previously assembled in step 1). Finally, connect the 8 middle horizontal
suspended tubes (E) on the middle and lower shelfs.
16
Lower fixed shelf
Connect the lower shelf (I), the horizontal
tubes (A) and the four wheels (J) directly
into the shelf hole.
Lower fixed
shelf
Outer cover (case)
Air vent

Publicidad

Tabla de contenido
loading

Tabla de contenido