AquaPRO 63043 Manual Del Propietário página 10

Ocultar thumbs Ver también para 63043:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

DEEP WELL INSTALLATION INSTRUCTIONS
MATERIALS REQUIRED (NOT INCLUDED)
One can PVC cement & primer (read instructions
carefully)
One can thread compound (read instructions
carefully)
Teflon tape
Rigid pipe
Check valve
Flexible plastic pipe/clamps
Elbow
Nipple
WARNING: All joints and connections must be AIRTIGHT. A single leak will prevent the proper operation of the pump. Wrap
thread tape clockwise on all threaded connections. For all non-threaded connections, you must use PVC Purple Primer and
PVC Cement to ensure airtight seals. Measure all pipe lengths before attaching.
NOTE: A foot valve is a check valve that is used to keep the water from running back into the well from the pump and
maintain hydraulic pressure when the pump is not running. If the foot valve does not hold the water the pump will lose it's
prime and will not pump water. If the foot valve open pressure is too high (the spring is too stiff), or the flow area is too small,
the pump suction head and flow rate will significantly drop.
CAUTION: To avoid skin burns, unplug the pump and allow time for it to cool after periods of extended use.
1. Remove the bolts from the pump body and take out the ejector from the pump.
2. Remove the venturi tube (#12), and then use a 5/8 inch socket to unscrew the nozzle (#03) counter clockwise.
One well seal with vent plug
Foot valve
Discharge tee/Priming tee and plug
Relief valve
Adaptor
Tank
Tank tee
10

Publicidad

Tabla de contenido
loading

Tabla de contenido