Installation Instructions; Tools And Materials Required; Electrical Requirements; Unpacking Your Dryer - Haier HLF11E Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION INSTRUCTIONS

Select a suitable location for the dryer on a hard even surface away from direct
sunlight or heat source e.g. radiators, baseboard heaters, cooking appliances etc.
Any floor unevenness should be corrected with the leveling legs located on the
bottom of the dryer.

Tools and Materials Required

• Phillips head and flathead screwdrivers
• Channel-lock adjustable pliers
• 1/2 inch open end wrench
• Carpenter's level
• Measuring tape (12ft. min.)
• Duct tape
• Rigid or flexible metal 4 inch (10.2 cm) duct
• Vent hood

Electrical Requirements

Power Supply:
3 or 4 wire, 240 Volt, 30 Amp, 60Hz, 1 Phase
Power Supply Cord Kit: (not supplied when sold in the United States)
The dryer MUST employ a 3-conductor power supply cord NEMA 10-30
type SRDT rated at 240 Volt AC minimum, 30 Amp., with 3 open end
spade lug connectors with upturned ends or closed loop connectors and
marked for use with clothes dryers. If being installed in a manufactured
(mobile) home, the dryer MUST employ a 4-conductor power supply cord
NEMA 14-30 type SRDT or ST (as required) rated at 240 Volt AC
minimum, 30 Amp., with 4 open end spade lug connectors with
upturned ends or closed loop connectors and marked for use with clothes
dryers. See Electrical Connections for A 4-Wire System.

Unpacking Your Dryer

1. Remove all packaging material. This includes the foam base and all
adhesive tape holding the dryer accessories inside and outside.
2. Inspect and remove any remains of packaging, tape or printed
materials before using the dryer.
English
12

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido