6. Commissioning, operation
6. Commissioning, operation
6.1 Mounting
The thermometer must be installed in such a way that the permitted operating
temperature (ambient, medium) is neither exceeded nor is lower than permitted
with regard to convected and thermal radiation.
6.2 Electrical connection
WARNING!
Only connect the instrument when it is not powered!
Cables and Wiring
Fine gauge stranded cables are supplied with ferrule-ends
The cable used must comply with the relevant requirements with respect to
stability and temperature
The connecting cable must be run in such a way that the possibility of
mechanical damage is eliminated
6.3 Pin assignment
Plug AMP Junior
Power Timer
Circular connector
M12 x 1
WIKA Operating Instructions Screw-in Thermometers, Model TF35
FASTON blade terminal
6.3 x 0.8 mm
Connector Deutsch
DT04-2P
FASTON blade terminal
4.8 x 0.8 mm
Bayonet connector
DIN 72 585
GB
11