Descargar Imprimir esta página

SANUS VuePoint F215 Manual De Instrucciones página 17

Publicidad

Manage Cables - Cable Tunnel
NOTES:
This product is NOT recommended for brick, plaster, or
wallpapered walls.
If wall has been painted, allow paint to cure at least 30 days
before installing cable tunnels.
Wipe away any dirt, dust, grease, etc. on the surface and let dry
completely before installing.
The tunnels
can be painted to match your wall.
25
The tunnels
can be cut to fit the length required.
25
To Remove Adhesive Clips
1.
Insert a flat object (e.g. - knife blade) behind the clip and the
adhesive pad and pry off the plastic clip.
2.
Peel off the adhesive pad with your fingers.
3.
If adhesive residue remains, use a cloth soaked in an organic
solvent to wipe away the residue.
NOTE: First test the solvent in a concealed spot to make
sure it will not damage the wall surface.
1
Space clips
evenly along the length of the tunnel(s)
23
with a clip near each end. To combine tunnels, use the long
clip
to connect where they meet.
24
A
Press firmly until clips snap in place.
B
Peel off backing of adhesive pads on clips.
NOTE: If using two tunnels, install five clips - four
clips and one long clip
If using only one tunnel, install three clips
TIP: If the edges of the two tunnels do not align, reverse
one tunnel end for end.
23
A
.
24
.
23
24
23
B
25
23
17

Publicidad

loading