Flotec FPZS25T Manual Del Usuario página 5

Bombas sumergibles de plástico para sumidero
Ocultar thumbs Ver también para FPZS25T:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Operation
branch circuit. Both pump and switch are supplied
with 3-wire cord sets with grounding-type plugs.
Switch plug is inserted directly into outlet and pump
plug inserts into opposite end of switch plug.
Risk of electric shock. Can shock, burn or
kill. Pump should always be electrically grounded to a
suitable electrical ground such as a grounded water pipe
or a properly grounded metallic raceway, or ground wire
system. Do not cut off round ground pin.
For parts or assistance, call Flotec Customer Service at
8. If pump discharge line is exposed to sub-freezing
weather conditions, portion of exposed pipe must be
installed so any water remaining will drain out or
down due to gravity. Failure to do this can cause
water trapped in discharge to freeze which could
result in damage to pump.
9. After piping, check valve and float switch have been
installed, the unit is ready for operation.
10. Check the pump operation by filling sump with water
and observing pump operation through one complete
1-800-365-6832
5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Fpzs33tFpzs33vFpzs50tFpzs50vFpzs75v

Tabla de contenido