Tools And Materials Required; Remove The Packaging - GE Profile PV977 Manual Del Propietario E Instrucciones De Instalación

Campanas de ventilación de chimenea para isla
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

TOOLS AND MATERIALS REQUIRED

(NOT SUPPLIED)
Pencil and tape measure
Spirit level
Phillips screwdriver
Electric drill with 3/16" bits,
#2 Phillips head
Step ladder
UL listed wire nuts
Aluminized
Strain relief for
Duct tape
junction box
120V 60Hz. 15 or 20 Amp,
2-wire with ground, properly
grounded branch circuit
Installation Preparation
Safety glasses
Hammer
Flashlight
Metal snips
Pliers
Wire cutter/stripper
Saber saw or Key Hole saw
8" Round metal
duct, length to
suit installation

REMOVE THE PACKAGING

CAUTION:
against sharp edges.
• Remove the duct covers.
• Remove the hardware bag, literature package
and other boxed parts.
• Remove and properly discard the protective
plastic wrapping and other packaging materials.
10
Wear gloves to protect

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido