GE Profile PV977 Manual Del Propietario E Instrucciones De Instalación página 17

Campanas de ventilación de chimenea para isla
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

STEP 4 DETERMINE FRAME HEIGHT
•Measure exact
E
Frame
ceiling height.
height
•Find the exact
frame height
required
D
2-3/8"
on the chart
on page 12.
•Use this formula
to determine
your frame
height:
A-(B+C+D) =
Frame height E where
A is the ceiling height,
B is the countertop
height, C is the height
determined by the
chart on page 12, D
is the height of the
hood measured from
the straight bottom
portion to the top
at the center.
Installation Instructions
Ceiling
A
height
24" Min.*
C
30" Max.*
B
36" Min.
*See Chart on page 12.
STEP 5 INSTALL UPPER VERTICAL
SUPPORTS TO HOOD ASSEMBLY
• Determine how much of the upper vertical
supports will need to be above the lower supports
to accomplish the frame height determined in
step 4 for this installation.
• Using screws provided, attach the 4 upper vertical
supports to the lower vertical supports at the
position determined for frame height. The upper
vertical supports are mounted to the outside
of the lower supports.
E
17

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido