UNDER THE CABINET INSTALLATION – TOP VENT
Preparation before Installation
NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE
VENT OPENING.
Decide the location of the venting pipe from the hood to the outside. Refer to Figure 1.
-
A straight, short venting run will allow the hood to perform more efficiently.
-
Try to avoid as many transitions, elbows, and long run as possible. This may reduce
-
the performance of the hood.
Temporarily wire the hood to test for proper operation before installing.
-
Peel protective film off the hood (if any).
-
For installing under the cabinet with recessed bottom, attach 4-inch wide wood filler
-
strips (not included) on each side. Refer to Figure 2.
Measure and create access opening for electrical wires under the cabinet.
-
Cut the multi duct exhaust according to the size of the venting pipe. Refer to Figure 3.
-
6" Round Vent
Figure 1
7" Round Vent
8
Figure 2
3-1/4" x 10" Vent
Figure 3