Installation And Initial Startup - FSP FP 400 Manual De Instrucciones

Ocultar thumbs Ver también para FP 400:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 15

3. Installation and Initial Startup

NOTE: Before installation, please inspect the unit. Be sure that nothing
inside the package is damaged.
Placement & Storage Conditions
Install the UPS in a protected area that is free of excessive dust and has adequate air flow.
Please place the UPS away from other units at least 20 cm to avoid interference. Do NOT
operate the UPS where the temperature and humidity is outside the specific limits. (Please
check the specs for the limitations.)
Connect to Utility and Charging
Plug in the AC input cord to the wall outlet. For the best results,
we suggest to charge the battery for at least 4 hours before
initial use. The unit charges its battery while connecting to the
mains.
Connect the Loads
Plug in the loads to output receptacles on the rear panel of the UPS. Simply turn on the
power switch of UPS unit, then devices connected to the UPS will be protected by UPS unit.
CAUTION: NEVER connect a laser printer or scanner to the
UPS unit. This may cause damage to your equipment.
Turn On/Off the Unit
Turn on the UPS unit by pressing the power switch. Turn off the UPS unit by pressing
again the power switch.
2
4 hours

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Fp 600Fp 800

Tabla de contenido