Descargar Imprimir esta página

Leviton 57000 Serie Instrucciones De Instalación página 6

Ocultar thumbs Ver también para 57000 Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

L1
L2
L3
N
G
Circuit Breaker Panel
Wye system illustrated —
Delta system would not include neutral line
L1
L2
L3
N
G
Circuit Breaker Panel
Wye system illustrated —
Delta system would not include neutral line
panel. If any metallic filings enter panel, care must be exercised to remove
them using a vacuum device or other tools, as required.
Mount securely: Refer to the "Panel Mounting" instruction sheet
(enclosed).
G
Fig. 4 - TVSS Feed Through Connection
G
Fig. 5 - TVSS Shunt Connection
Conduit
N
L1
L2
L3
TVSS
will accept
up to
TVSS
#3 AWG
stranded
wire
Conduit
N
L1
L2
L3
TVSS
To
loads
up to
100
Amps
N
G
To
loads
N
G
30 Amp
Disconnect
Switch
Page 4

Publicidad

loading