Read through the entire instruction before work is
begun.
Items in illustrations in this instruction may differ
from the model being worked on. The illustrations
are used for different instructions and may therefore
vary between engine models. The essential
information is correct.
This kit contains:
Designation
Power take-off
O-ring
Flange screw, M10X30*
Installation instructions
* delivered with engine
NOTE! Use screws (3) delivered with engine.
Installation of the Power Take-Off unit
1. Unscrew the 2 screws (3) and put the screws
aside for later use. Remove the protection screen
(A). Remove the O-ring (B). See fig 1.
2. Mount the O-ring (2) on the PTO-unit.
See figure 2.
3. Mount the PTO-unit using the existing screws (3).
Tighten the screws.
Tightening torque 48±8 (35.5±6 lbf ft)
NOTE! The product, Power take-off / PTO SAE A
is manufactured according to the standard SAE A.
The product is intended for installations covered by
the mentioned standard.
Quantity Pos. in fig.
1
1
1
2
2
3
1
-
Anweisung vor Aufnahme der Arbeit vollständig
durchlesen.
Da die Bilder in den Service-Unterlagen bei
verschiedenen Motormodellen verwendet werden,
können einzelne Teile von der jeweiligen Ausführung
abweichen. Die wesentlichen Informationen stimmen
jedoch stets überein.
Inhalt des Satzes:
Bezeichnung
Power take-off
O-ring
Flange screw, M10X30*
Installation instructions
* delivered with engine
NOTE! Use screws (3) delivered with engine.
Installation of the Power Take-Off unit
1. Unscrew the 2 screws (3) and put the screws
aside for later use. Remove the protection screen
(A). Remove the O-ring (B). See fig 1.
2. Mount the O-ring (2) on the PTO-unit.
See figure 2.
3. Mount the PTO-unit using the existing screws (3).
Tighten the screws.
Tightening torque 48±8 (35.5±6 lbf ft)
NOTE! The product, Power take-off / PTO SAE A
is manufactured according to the standard SAE A.
The product is intended for installations covered by
the mentioned standard.
Anz.
Pos. im Bild
1
1
1
2
2
3
1
-