Rowenta GS6010 Instructivo De Operación página 5

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ssembly :
Preparation:
• Place the base on the floor and
remove the water tank.
Install pole in main unit:
• Insert the pole according to the diagram
to the right, ensuring the marks on the
unit and the pole line up.
• Press pole firmly into place.
Locking the pole :
•Lay the base on its side with the
inserted pole.
•Turn the lockbar located on the bottom
of the base 90° to secure the pole.
Use a coin or similar object to turn the
lockbar.
• fter the pole is locked, pick up the
unit and return to its use position
Installing Integrated Hanger :
•Position the hanger with the brush
hooks facing to the outer side
•Check for correct orientation with the
index marks matching
•Insert the end of the hanger into the
pole connection and press it into the
pole
until
engages.
•If it is required to dismantle the pole
from the main unit, tilt the appliance
and unlock the pole first
•Then place the appliance back into it's
upright position and pull out the pole
•Dismantling of the hanger from the
pole by the customer is not foreseen.
ttaching Steam hose to main unit :
1) Insert hose plug into hose connector
on main unit.
2) Secure hose connector by pulling
clamping ring upwards.
the
hanger
properly
5
1
2

Publicidad

Tabla de contenido
loading

Tabla de contenido