Unpacking; Installation; Technical Data - Haier HD70-A82 Manual De Instrucciones

Secadora con bomba de calor
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 68

UNPACKING

Remove all packaging material including
the polystyrene base. All packaging
material should be recycled.
1 Cut the strips.
2 Lift the cover upwards.
3 Remove the protective parts.
4 Remove the base.
Ensure that any plastic wrappings,
bags, etc are kept out of the reach of
babies and young children. Danger of
suffocation.

INSTALLATION

WARNING. Following transportation and
installation, you MUST leave the dryer to
stand for two hours before use.
1 Check the dryer does not rock or
wobble.Adjust the four feet to level the
dryer before operation.
2 Make sure the socket meets the
requirements and connect it to an earthed socket outlet.
• Do not install in a room which is susceptible to frost. Water may cause damage
once it starts to freeze.
• Transport the dryer in a vertical upright position.
• There may be residual water in the dryer.
This can leak out if the dryer is at an angle.

TECHNICAL DATA

Power
Nominal load (kg)
HD70-A82
HD80-A82
Drying programs
Max. power (W)
Fuse (A)
Ambient temperature (°C)
Dimensions (H x D x W mm)
Net weight (kg)
Water protection level
6 | English
1
3
1
220 - 240 V~ / 50 Hz
7
8
12
900
min. 10
5 - 35
845 x 650 x 595
approx. 51,5
IPX4
2
4
2

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Hd80-a82

Tabla de contenido