Flow Switch - Hayward AQUA RITE pro Guia Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 46
If an AQL-CHEM kit will be used, take into consideration the space necessary for mounting
the unit as well as running the plumbing lines from the AQL-CHEM's probe cell to the pool
plumbing. Refer to the AQL-CHEM manual for specific mounting instructions.
Plumbing
Ensure that the AquaRite Pro installation does not constitute a cross connection with the local
potable water supply. Consult local plumbing codes.
The AquaRite Pro is packaged with a flow switch that installs into either the supplied 50 mm or
63 mm saddle clamp. The chlorinator cell, sold separately, installs into the supplied 50 mm cell
unions. For 63 mm pool plumbing, use the supplied adaptors to install the cell unions. Refer
to page 1 for information about available chlorinator cells.
The flow switch and cell should be plumbed in the return line to the pool/spa. The preferred
installation is after (downstream) all the pool equipment (filter, heater, solar, etc.). For proper
plumbing, refer to the overview diagram on page 13. Below, alternate configuration #1, #2 and
#3 shows the flow switch must be in front of the cell.
Never use configuration #4. The #2 is the best configuration.
FLOW
SWITCH
30 cm
minimum
ELECTROLyTIC

Flow Switch:

14 / 20
ELECTROLyTIC
CELL
VALVE
POOL
30 cm
minimum
VALVE
FLOW
SWITCH
CELL
POOL
IMPORTANT: There must be at least a 30 cm straight pipe run before (up-
stream) the flow switch. The flow switch must be plumbed before the cell.
To ensure proper operation, verify that the arrow on the flow switch (located
on top of gray hex) points in the direction of water flow. Refer to the diagram
on page 15.
1
30 cm
minimum
FLOW
SWITCH
VALVE
SPA
3
VALVE
FLOW
SWITCH
SPA
AquaRite Pro
2
ELECTROLyTIC
CELL
VALVE
VALVE
4
ELECTROLyTIC
CELL
VALVE
VALVE
Rev. C

Publicidad

Tabla de contenido
loading

Tabla de contenido