Certifications and Agency Standards
UL E#: E123072
cULus LISTED UL508 / CSA C22.2 No. 14-05, Ind. Control Equip.
cULus LISTED UL924 / CSA C22.2 No. 141-10 Emergency Lighting.
FCC Part 15, Class A
Specifications
Type 1 Enclosure
Operational Temperature: 32° to 104° F (0° to 40° C)
Inspection
Carefully unpack the relay cabinet, and inspect to make sure there is no hidden shipping
damage. Report any damage to the freight carrier who delivered the system. Claims for
damages are filed with the freight carrier. In case of damaged components, your relay
cabinet may be serviced in the field with factory replacement parts.
Installation
Installation Checklist
Install the cabinets by following these simple steps:
Step 1:
Unpack the system
Step 2:
Report any damage to the freight carrier
Step 3:
If appropriate, remove any covers and/or doors
Step 4:
If appropriate, remove the mounting plate assembly and store where dam-
age will not occur to the electronics
Step 5:
Attach the cabinet to the wall (reference stickers inside the cabinet for
proper orientation if it is in question)
Step 6:
Drill conduit entry holes if KO's are not provided and attach conduit where
appropriate
Step 7:
Pull all wire into the cabinet
Step 8:
Test and verify all wiring by directly connecting Line to Load - Correct any
faults and re-test wiring prior to proceeding
Step 9:
If applicable, re-install any control electronics removed in step #4
Step 10: Terminate discreet input control wiring
Step 11: Terminate network control wiring
Step 12: Test each Line/Load circuit for shorts
Step 13: Terminate the feed & load wiring to each relay
Step 14: Blow out dust, dirt, or debris which has accumulated in the cabinet
Step 15: Apply power to the system
Step 16: Verify proper operation of each relay using the override buttons
Step 17: Configure cabinet per owner's requirements
0 to 90% Humidity non condensing
1