1. Refer to the connection diagram on the preceding page and the photo below:
2. Machines require a 2-wire plus ground supply which includes a current carrying neutral.
3. Power connections are made at the Main Terminal Block (MTB).
4. The MTB is located on the left-rear corner of the electrical panel behind the front access panel.
(See the illustration on the previous page.)
NOTE:
Provide a 3 foot service loop in the power cable at the back of the dishwasher for service.
To Connect Main Power to the Dishwasher:
1. Remove the lower front access panel of the dishwasher.
2. Locate the electrical mounting panel on the right-side of the machine.
Remove the retaining nut at the top of the panel that holds the panel in place.
3. Lower the panel and pull it forward to gain access the MTB.
4. Feed the power cable through the cable hole located
on the right side, as viewed from the front of the machine,
into the interior of the machine.
5. Make sure the cable passes through the cable mounting
bracket located near the front-center of the
base and secure the cable with a cable connector.
6. Connect the ground wire to the base of the dishwasher
with the ground screw provided next to the
cable mounting bracket.
7. Feed the remaining cable wires to the Main Terminal
Block and connect according to the connection
diagram to the right.
Cable Bracket
To Main Terminal Block
Route the supply cable through the cable bracket.
From Rear of Machine
GRD
L1
L2
Electrical Connections
SINGLE PHASE POWER CONNECTION
208-240VAC 50/60/1
GRD
L1
208-240
VAC
HOW TO CONNECT POWER
1. Check the data plate on the front of the
dishwasher for the voltage of the machine.
2. Remove the lower-front access panel.
3. Lower the electrical component bracket.
4. Feed the power cable from the rear of the
dishwasher to the center of the machine
and through the cable bracket.
5. Connect the ground wire to the base of the
dishwasher using the ground screw located
near the bracket.
6. Feed the power leads to the terminal block.
7. Connect L1, L2 and ground.
8. Main Power connections are complete.
Installation
L2
3