Data Display Of Wired Controller; Care And Maintenance; Maintenance Period; Removing Scale - mundoclima MUENR-H9T Manual De Instalación Y Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

11.2 Digital display of main board
The data display area is divided into Up area and Down area,
with two groups of two-digit half 7-segment digital display,
respectively.
a. Temperature display
Temperature display is used for displaying the total outlet water
temperature of unit system, outlet water temperature, condenser
pipe temperature T3A of system A, condenser pipe temperature
T3B of system B, outdoor environmental temperature T4,
anti-freezing temperature T6 and setting temperature Ts, with
allowable data display scope -15
higher than 70 , it is displayed as 70 . If there is no effective
date, it displays "— —" and indication point
b. Current display
Current display is used for displaying Modular unit system A
compressor current IA or system B compressor current IB, with
allowable display scope 0A~99A. If it is higher than 99A, it is
displayed as 99A. If there is no effective date, it displays "— —"
and indication point
A
is on.
c. Failure display
It is used for displaying the total failure warning date of unit or
that of Modular unit, with failure display scope E0~EF, E
indicating failure, 0~F indicating failure code. "E-" is displayed
when there is no failure and indication point
time.
d. Protection display
It is used for displaying the total system protection data of unit or
the system protection data of Modular unit, with protection
display scope P0~PF, P indicating system protection, 0~F
indicating protection code. "P-" is displayed when there is no
failure .
e. Unit number display
It is used for displaying the address number of the currently
selected Modular unit, with display scope 0~15 and indication
point
#
is on at the same time.
f. Display of online unit number and startup unit number
They are used for displaying the total online Modular units of the
whole unit system and the number of the Modular unit under
running state, respectively, with display scope 0~16.
Any time when the spot check page is entered to display or
change Modular unit, it is needed to wait for the up-to-date data
of the Modular unit received and selected by wired controller.
Before receiving the data, the wired controller only displays
"——" on the data display Down area, and the Up area displays
the address number of the Modular unit. No page can be turned,
which continues until the wired controller receives the
communication data of this Modular unit.

11.3 Care and maintenance

1) Maintenance period

It's recommended that before cooling in summer and
heating in winter every year, consult local air conditioner
customer service center to check and maintain the unit,
to
prevent
air
conditioner
inconvenience to your life and work.
2) Maintenance of main parts
70 . If the temperature is
C
is on.
#
is on at the same
errors
which
bring
91
2) Maintenance of main parts
Close attention should be paid to the discharge and suction
pressure during the running process. Find out reasons and
eliminate the failure if abnormality is found.
Control and protect the equipment. See to it that no random
adjustment be made on the set points on site.
Regularly check whether the electric connection is loose,
and whether there is bad contact at the contact point caused
by oxidation and debris etc., and take timely measures if
necessary.
Frequently check the work voltage, current and phase
balance.
Check the reliability of the electric elements in time.
Ineffective and unreliable elements should be replaced in
time.

11.4 Removing scale

After long-time operation, calcium oxide or other minerals will
be settled in the heat transfer surface of the water-side heat
exchanger. These substances will affect the heat transfer
performance when there is too much scale in the heat
transfer surface.
Sequentially cause that electricity consumption increases
and the discharge pressure is too high (or suction pressure
too low). Organic acids such as formic acid, citric acid and
acetic acid may be used to clean the scale. But in no way
VKRXOG FOHDQLQJ DJHQW FRQWDLQLQJ ÀXRURDFHWLF DFLG RU ÀXRULGH
should be used as the water-side heat exchange is made
from stainless steel and is easy to be eroded to cause
refrigerant leakage. Pay attention to the following aspects
during the cleaning and scale-removing process:
1 ) Wa t e r - s i d e h e a t e x c h a n g e r s h o u l d b e d o n e b e
professionals. Please contact the local air-conditioner
customer service center.
2) Clean the pipe and heat exchanger with clean water after
cleaning agent is used. Conduct water treatment to prevent
water system from being eroded or re-absorption of scale.
3) In case of using cleaning agent, adjust the density of the
agent, cleaning time and temperature according to the scale
settlement condition.
4) After pickling is completed, neutralization treatment needs
to be done on the waste liquid. Contact relevant company for
treating the treated waste liquid.
5) Protection equipments (such as goggles, gloves, mask
and shoes) must be used during the cleaning process to
avoid breathing in or contacting the agent as the cleaning
agent and neutralization agent is corrosive to eyes, skins and
nasal mucosa.

11.5 Winter shutdown

For shutdown in winter, the surface of the unit outside and
inside should be cleaned and dried. Cover the unit to prevent
dust. Open discharge water valve to discharge the stored
water in the clean water system to prevent freezing accident (it
is preferable to inject antifreezer in the pipe).

11.6 Replacing parts

Parts to be replaced should be the ones provided by our
company.
Never replace any part with different part.

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Muenr-h9tk

Tabla de contenido